How does one ensure that check standards will be run after any triggered auto dilutions that have been added to the end of the run worksheet?

Document ID

Document ID TE4244

Published Date

Published Date 16/04/2019
Question
How does one ensure that check standards will be run after any triggered auto dilutions that have been added to the end of the run worksheet?
Summary
Ensuring QC standards are analyzed at the end of the run when triggered auto dilutions are performed.
Answer
 If a DQM set containing QC check standards has been set to run after every N samples, the user needs to check the Close End of Run box.  This will make sure that the end of the run always includes these QC standards.  This will be enforced even if samples are added during the run, either by the user or by triggered auto dilutions.